What should our HOA board do when the city wants to connect a public road through our neighborhood?

By OurHOA · General information · Revised

What an HOA board can do when the city or a developer plans to extend a public road into the neighborhood: plat review, hearings, traffic studies, and condemnation.

Part of the HOA board handbook: vendors, projects and upkeep.

The short answer

Get the plans in writing, find out who owns the land the road would cross, and show up early with specific requests. Boards that wait for the final city council vote and then argue that the road should not exist usually come away with nothing. Boards that comment at the first planning meeting and ask for concrete things, such as a construction route that avoids the private streets, a sidewalk, a stop sign, or the city taking over maintenance of the connecting segment, often get some of them. How much say the board has depends on one fact: whether the road would run over public right-of-way that already exists or over land the association owns. Settle that before anything else. Rules vary by state and by your plat and governing documents, and this guide is general education, not legal advice. If the city or a developer wants association land, hire a real estate attorney before you answer any letter.

Figure out which kind of connection this is

Most of these fights fall into one of three cases. A stub street. Your streets are public, and the original plat ended one of them at the property line, sometimes with a barricade or a sign that says the street will be extended. The right-of-way was dedicated to the public when the plat was recorded. The association does not own it and cannot block it. Many owners bought without noticing the stub, so expect anger aimed at the board. A connection to private streets. The association owns the streets as common area. A city or developer cannot simply pave into them. They need the association to agree, or a public body has to acquire the land through condemnation. A road across other common area. The new road would cross a greenbelt, a drainage tract or an amenity lot the association owns, to reach land behind the neighborhood. That is also an acquisition question. Pull the recorded plat, the declaration, the deeds to any common area tracts and any easements the developer granted. The county clerk's records and the turnover binder usually have them. Then ask the city planning or engineering department for the application, the proposed plat and any traffic impact analysis, in writing.

Where the board has a say on the plat

When the road comes with a new subdivision next door, the developer files a plat. In Texas, a city's review of a plat is mostly a checklist. Local Government Code section 212.005 says the city must approve a plat that meets the requirements, section 212.009 gives it 30 days after filing to approve, approve with conditions or disapprove, and section 212.010 lists the standards, including that the plat conforms to the city's general plan and its current and future streets. If the city's thoroughfare plan shows your stub connecting, the plat that connects it is likely to be approved, and owner objections alone will not change that. That does not make comment useless. It changes what to say. Arguments about the standards work: road width, sight lines at a curve, drainage, whether the connection matches the adopted plan. Arguments that the neighborhood prefers quiet do not. Public comment is protected. Texas Government Code section 551.007 requires a city council or commissioners court to let any member of the public address it on an agenda item before or during its consideration. Florida section 286.0114 gives the public a reasonable opportunity to be heard on a proposition before a board or commission acts. Colorado procedures come from local codes, so ask the planner when comment is taken. In all three states, get on the city's notice list for the project and read every agenda.

When the road needs association land

If the road would cross land the association owns, the board's position is much stronger, because the association is a property owner with legal rights. A voluntary sale or dedication usually needs an owner vote. In Colorado, CCIOA section 38-33.3-312 lets the association convey common elements only with at least 67 percent of the votes, including 67 percent of the votes not held by the declarant, or a higher number if the declaration says so. Texas and Florida have no general HOA statute on this, so the declaration controls. In Florida, section 720.301(2) counts land dedicated to the association by a recorded plat as common area even if the association never got a deed, which matters when a city claims a tract is unowned. If the association says no, a public body may use eminent domain, and each state sets a negotiation process first. In Texas, Property Code section 21.0111 requires the entity to disclose its appraisal reports from the last 10 years by certified mail when it makes an offer, section 21.0112 requires the Landowner's Bill of Rights, and section 21.0113 requires a written initial offer, a final offer at least 30 days later that is no lower than a certified appraisal, and at least 14 days to respond. In Florida, section 73.015 requires a written offer, the appraisal, right-of-way maps and plans within 15 business days of a request, and at least 30 days to respond before suit. In Colorado, section 38-1-121 requires notice of intent, and when the property is worth $5,000 or more the condemning authority pays the reasonable cost of the owner's own appraisal submitted within 90 days. CCIOA section 38-33.3-107(3) sends any award for common elements to the association, not to individual owners.

What to ask for

Write the list before the first meeting and rank it. A city may refuse to drop the road and still agree to most of this: A construction route that keeps trucks off the association's private streets, or a repair bond and a before-and-after pavement survey if they must use them. Work hours, dust control and a named contact for complaints. Stop signs, a crosswalk or traffic calming at the new intersection, based on the traffic impact analysis. A sidewalk on the new segment that ties into yours. A written statement of who maintains the connecting segment, its drainage and its streetlights. If the road is public, the city should own all of it to the property line. A fence, wall or planted buffer where the new road runs behind lots, and who pays to maintain it. Relocation of an entry sign, mailbox cluster or gate, at the developer's cost. If the streets are private and gated, a public connection usually means the gate goes. Decide early whether the owners would rather sell the streets to the city entirely, which our guide on asking the city to take over HOA private streets covers.

A comment letter and motion you can adapt

Adopt the association's position by a vote at a noticed open board meeting, so no single director speaks for the community without authority. Sample motion: 'Move to authorize the president to submit the attached written comments on [project name and case number] to the [city] planning commission and city council, and to speak at the public hearings, requesting the conditions listed in the letter.' Sample letter paragraph: 'The [name] Homeowners Association owns and maintains the private streets shown on the attached map. The association does not consent to construction traffic on those streets. We ask that the approval require all construction access from [road], a pavement condition survey of [street] before work begins, a stop sign and crosswalk at the new intersection with [street], and a written statement that the city will maintain the extended right-of-way, its drainage and its streetlights. We request copies of the traffic impact analysis and the drainage report for review.' Send the letter to the planner by email and ask that it go into the hearing packet. Send owners a short notice with the hearing date and the case number, and tell them they can speak for themselves.

A sample timeline

Week 1: an owner spots survey stakes or a notice sign. The president asks the planning department for the application, plat and studies in writing. Weeks 2 and 3: pull the plat, deeds and easements. Determine whether the road crosses public right-of-way or association land. Call an attorney if it is association land. Week 4: board meeting to adopt a position and the request list. Notice to owners. Weeks 5 to 8: meet the planner and the developer's engineer. Submit the comment letter. Planning commission hearing: the president presents, owners speak. City council or commissioners court: same, if the item goes there. After approval: get the conditions in writing, put the construction start date on the board calendar, and photograph the streets before the first truck arrives. If association land is involved, add the negotiation periods above and an owner vote on any sale. In Texas the offer steps alone take at least 44 days from the initial offer, and the vote adds whatever notice period your bylaws require.

Mistakes boards make

Arguing against a road that the recorded plat already promised. Owners will want it, but it uses up the board's credibility on the one point it cannot win. Letting a director tell the developer 'we are fine with it' in a site visit. That gets quoted at the hearing. Signing a right-of-entry, easement or dedication form the developer drafted, without an attorney and without the owner vote the documents require. Ignoring maintenance. A short road segment that nobody formally accepted can end up maintained by the HOA for decades. Forgetting traffic on internal streets. If the connection will add cut-through traffic, collect speed counts before and after, and see our guide on adding speed humps or traffic calming on private HOA streets.

Sources

These guides are general education for HOA boards and residents, not legal, tax, or financial advice. Rules vary by state and by your community's governing documents - check with a professional for your situation.

More from the board handbook

Track every request from report to done

Assign maintenance requests to a board member, email vendors a work order with photos, and keep the history. Free to start.