A house in our HOA burned down. What does the board do about dues, the lot and the rebuild?

By OurHOA · General information · Revised

What an HOA board does when a single-family home burns: dues and payment plans, securing the lot, rebuild deadlines that fit the insurance clock, and fair enforcement.

Part of the HOA board handbook: vendors, projects and upkeep.

The short answer

In a community of detached homes, the owner's insurer pays to rebuild the house, not the association. The board's work is narrower and runs longer than anyone expects. Make sure the burned lot is safe and fenced, keep the owner's account from turning into a collection file while the claim is open, approve rebuild plans quickly, and set any rebuild deadline so it fits the owner's insurance clock rather than fighting it. Enforcement comes last, after notice, and only if the lot sits. This guide covers a single-family home. For a fire in an attached building, where the association's master policy usually rebuilds, read our guide on what an HOA board should do after a fire in a condo building. Rules vary by state and by your declaration, so treat this as education, not legal advice, and call the association's attorney before you fine or sue a fire-damaged owner.

Read the declaration before the first call

Pull three clauses the day after the fire and send them to every director. The insurance clause says who must insure the house and for how much. Most planned-community declarations make the owner carry full replacement-cost coverage on the dwelling. The casualty or rebuild clause says how fast an owner must clear debris, start rebuilding and finish, and whether the lot may stay vacant. Many older declarations say only 'promptly' or 'within a reasonable time'. The entry or self-help clause says whether the association may go onto a lot to fix a hazard and charge the owner. If there is no entry clause, the board has no right to send a crew onto private property, however bad the lot looks. Very few abate dues for a destroyed home, and a board that waives them without authority in the documents is shifting the cost to every other owner.

The first two weeks on the lot

The fire department controls the site until it releases it. After that, the owner and the owner's insurer are in charge of the house, and the board's job is the edges. Call or email the owner within two days. Ask for a phone number and temporary address, the insurer's name and claim number, and whether fencing and debris removal are already booked. Whether the policy pays for fencing and debris removal is a question for the owner's adjuster, and most adjusters want an open lot secured anyway. The Texas Department of Insurance tells policyholders to photograph the damage, make temporary repairs to prevent more loss and keep every receipt, and you can pass that advice along. If the owner cannot be reached and the lot is a hazard to children or neighbors, call the city or county code office before you consider self-help. Florida's emergency powers statute, section 720.316, lets a board contract for debris removal and close off areas only after a declared state of emergency, and it is written around common areas, not one owner's lot after a kitchen fire.

The account while the house is gone

Assessments keep coming due. They attach to the lot, not the house, and the pool, the roads and the insurance on the clubhouse still cost the same. What the board controls is how the account is handled. In Texas, section 209.0062 of the Property Code requires any association with more than 14 lots to adopt payment plan guidelines with a minimum term of three months, and no additional monetary penalties accrue while the owner is on the plan. In Colorado, C.R.S. 38-33.3-316.3 requires a good-faith effort to set up a plan that lets the owner pay in equal installments over at least 18 months. Florida's chapter 720 does not require a plan, but nothing stops a board from offering one. Our guide on how to write and run an HOA payment plan policy covers the paperwork. Two practical moves help most. Offer the plan in writing in the first month, before anything is late. And ask the owner to check whether their policy's additional living expense coverage reimburses continuing assessments, since some policies treat them as an added cost of displacement. Colorado section 10-4-110.8(6)(b) requires replacement-cost homeowner policies to include at least 12 months of that coverage.

Set rebuild deadlines that fit the insurance clock

A rebuild of a total loss commonly runs a year or more once the claim, design, permits and a contractor's schedule are added up. Before the board sends any deadline letter, find out what the owner's policy and state law allow. Colorado section 10-4-110.8(13)(b) gives an owner-occupant whose home was lost in a wildfire the governor declared at least 36 months from the first actual cash value payment to submit rebuild receipts, plus two optional six-month extensions for permit, material or contractor delays. The same subsection bars the insurer from denying extended replacement cost or code upgrade money because the owner chose to rebuild elsewhere. In Florida, section 627.7011(3)(a) requires the insurer on a total loss of a dwelling to pay replacement cost without holding back depreciation. Both rules mean some owners will take the check and sell the lot rather than rebuild, and the board should be ready to answer a buyer's questions about the rebuild clause. Then make approval easy. Adopt a fast track: plans that match the original footprint, height and approved exterior palette get a decision within 15 days, and changes go through normal review. In a Texas association of more than 40 lots, section 209.00505 requires a denial to go out in writing with the reasons and gives the owner 30 days to request a hearing before the board, so follow it for any denial.

If the lot sits

Most owners move as fast as their insurer and contractor let them. When one does not, the declaration's rebuild deadline is enforceable like any other covenant, but only through the steps your state requires. In Texas, section 209.006 requires written notice by certified mail before a fine, a suspension or a charge for property damage. The notice must describe the violation, give a reasonable period to cure, and tell the owner they may request a hearing within 30 days. In Florida, section 720.305(2) caps fines at $100 per violation and $1,000 in the aggregate for a continuing violation unless the governing documents say otherwise. The board must give at least 14 days' written notice of a hearing before a committee of at least three owners who are not directors, officers or their relatives, and no fine applies if the owner cures first. In Colorado, C.R.S. 38-33.3-209.5(1.7)(b) allows a 72-hour cure notice only for a real health or safety threat, such as an open basement or a collapsing wall. Anything else gets 30 days to cure by certified mail, fines capped at $500 in total for the violation, and two consecutive 30-day cure periods before legal action. Before you send anything, ask whether the owner has a signed contract, a pending permit or an open dispute with the insurer. Each is a reason to extend, in writing.

Wording the board can use

A motion for the first meeting: 'The board names [director] as the association's contact for the owner of [address] following the fire on [date]. The board offers the owner a payment plan under the association's payment plan policy, waives late fees on the account through [date], and adopts a 15-day review for rebuild plans that match the original footprint, height and approved exterior. Any violation notice concerning the lot requires a board vote.' A first letter to the owner: 'We are sorry for your loss. The association will not pursue late fees or violation notices on your lot while you work with your insurer. Assessments continue under the declaration, and you can spread any balance over a payment plan; the enclosed form explains how. The declaration's rebuild provision is enclosed for your contractor. Please send us your insurer's name, your claim number and the best way to reach you, and tell us if the lot needs fencing we can help you arrange.'

A sample first year

Week 1: contact the owner, pull the three declaration clauses and confirm the lot is fenced. Week 2 to 4: board vote on the motion above, payment plan offer and the rebuild clause sent to the owner. Months 2 to 4: debris cleared, with a written note from the owner's contractor or adjuster if it runs longer. Months 4 to 9: architectural submission, fast-track decision and building permit. Months 6 to 18: construction. Check in by phone or email every 60 days and write down what you heard. Only if the lot has sat with no contract, no permit and no reply for several months does the board move to the state's notice process, and even then it starts with the cure period, not a fine.

Mistakes boards make

Sending the standard late notice in the month after the fire because nobody paused the collection schedule. Waiving dues outright without authority, then hearing from the next owner who had a flood. Letting several directors and a few neighbors each call the owner. Setting a six-month rebuild deadline the insurer's own timeline cannot meet. Sending a crew onto the lot without an entry clause. Treating this owner more harshly or more gently than the last one. Write the decisions into a short casualty policy, so the next family gets the same answer without a debate.

Sources

These guides are general education for HOA boards and residents, not legal, tax, or financial advice. Rules vary by state and by your community's governing documents - check with a professional for your situation.

More from the board handbook

Track every request from report to done

Assign maintenance requests to a board member, email vendors a work order with photos, and keep the history. Free to start.