Ice dams start inside the building. Warm air leaks from the units into the attic, warms the roof deck, and melts the snow above it. The water runs down to the cold eave, freezes, and the ridge of ice holds back the next round of meltwater until it backs up under the shingles and drips into someone's ceiling. The lasting fix is to keep the roof deck cold: seal the air leaks into the attic, add insulation, and make sure soffit vents actually move air. Roof raking, heat cable and steaming the ice off are emergency measures. If the same buildings get ice dams every winter, budget for an attic air-sealing project on those buildings and add an eave membrane at the next reroof. The rest of this guide covers the order of work, what to do mid-storm, and how to sort out who pays when water gets in. Rules vary by state and by your declaration, and this is general education, not legal advice.

Why one building gets ice dams and the next one does not

The Department of Energy's Building America Solution Center lists three conditions: snow on the roof, an attic that is poorly air sealed or poorly insulated, and freezing temperatures. It also says ice dams can form with as little as 2 inches of snow on the roof. NDSU Extension adds that they are most common when outdoor temperatures sit just below freezing. In a community where every building has the same roof, the difference is almost always in the attic. Common leak points on the DOE list include recessed can lights, plumbing stacks, furnace flues and chimneys, attic hatches, exhaust fan housings, top plates and kneewalls. In attached housing, look hard at the units with a bathroom fan venting into the attic instead of outdoors, a pull-down attic ladder with no weatherstripping, or an owner who added can lights during a remodel. The pattern on the roof tells you where to look: a dam over one unit and none next door points at that unit's ceiling.

Fix the attic first, in this order

Hire an energy auditor or an insulation contractor to inspect the attics over the worst buildings before you hire a roofer. Ask for a written report with photos of each leak point. Then do the work in this order. Air sealing comes first. Insulation does not stop air leaks, and blowing more of it over an open plumbing chase just hides the problem. The DOE guidance says the air barrier under the insulation must be continuous. Insulation comes second. NDSU Extension says northern-climate attics need roughly 15 inches of blown-in insulation, or R-50. Your local energy code may set a different minimum, so have the contractor quote to code at least. Ventilation comes third. Baffles at each soffit keep insulation from blocking the intake vents, and the DOE recommends at least a 2-inch air gap between the top of the insulation and the underside of the roof deck. Air should enter at the soffits and leave at the ridge or gable vents. If the attics span several units, the declaration usually makes the attic a common element or limited common element, and the association runs the project. Give owners written notice before crews need access through a unit's attic hatch.

Add an eave membrane at the next reroof

When the roof comes up for replacement in the reserve study, write an ice barrier into the roofing scope. The DOE Building America guidance says to install a self-adhering membrane from the eaves to at least two feet inside the interior plane of the exterior wall in cold climates (IECC climate zones 5 and higher), covering the metal drip edge, with 6-inch overlaps where sections join. On roofs sloped 8:12 or steeper, it calls for 3 feet or more of membrane up from the eave. Ask the roofer to show the membrane on the bid as its own line, with the coverage width, so you can compare bids. Our guide on hiring a roofer for an HOA roof replacement covers the rest of that bid. A membrane does not stop ice dams from forming. It keeps the water that backs up behind them out of the walls and ceilings while the attic work does the real job.

During a storm: what to do and what to skip

Roof raking works. Pulling snow off the lower part of the roof, where dams form, takes away the water that feeds them. NDSU Extension warns against getting on the roof and says to watch for overhead power lines while raking. If your snow contract does not already include roof raking on low eaves, price it as a per-event add-on with a trigger, such as 6 inches of snow on the roof, and a priority list of the buildings with a leak history. Heat cable is a patch. NDSU Extension puts heat tape among the ways owners treat the symptoms of ice dams instead of the cause. If the association already has heat cable on certain eaves, have an electrician test it each fall and put it on a switched circuit or controller rather than leaving it on all winter. Skip chipping the ice with hammers, shovels or picks. It tears shingles and gutters and puts someone on a ladder over ice. If a dam is already leaking, a roofing contractor with a low-pressure steamer can cut channels through it. Put that contractor's emergency number in the board's winter contact sheet before the first storm.

Who pays when water gets inside

Start with the declaration and the maintenance responsibility chart, because they usually answer this. The state default rules are a backstop. Texas: Property Code 82.107 makes a condo association responsible for maintaining, repairing and replacing the common elements and each owner responsible for the unit, except as the declaration provides. Colorado: C.R.S. 38-33.3-307 sets the same split, and 38-33.3-313(6) lets the association adopt written policies on claims and responsibility for deductibles. If you have no ice dam or water damage policy, adopt one before winter. In practice the roof and attic are usually the association's, and the drywall, paint and flooring inside are often the owner's and the owner's HO-6 carrier's. Where the declaration leaves it unclear, ask the association's attorney before you promise anyone a repair. If the loss exceeds the master policy deductible, our guide on levying an insurance deductible assessment after a loss explains how boards split that cost.

A season plan and a notice for owners

September: walk the buildings and list every eave with a leak or icicle history from last winter. Order the attic inspection on those buildings. October: have gutters cleaned and downspouts checked, test any heat cable, and confirm the roof raking add-on and the steamer contractor's number. November: send owners the notice below. December through March: after each storm with snow on the roofs, a director or the snow vendor drives the property and photographs the eaves. Big icicles over one unit go on the attic work list. Spring: price the air-sealing project and put it on the next budget. Notice wording you can adapt: 'Ice dams form when heat escapes into the attic and melts snow on the roof. Please help us find leaks. If you see large icicles, a stain on a ceiling or wall near an outside wall, or water dripping indoors during a thaw, report it to the board the same day at [email or phone] with a photo. Do not climb onto the roof or chip at ice. The association will send its contractor.'

Mistakes boards make

Adding attic vents before sealing leaks. Venting a leaky attic pulls more warm air out of the units. Treating every leak as a roof defect. Roofers get called back, find nothing wrong with the shingles, and bill for the trip. Look in the attic first. Letting owners install their own heat cable on the association's roof. Make it a written rule that nothing gets fastened to the roof or gutters without board approval. Waiting for a ceiling to fall before adopting a water damage policy. A policy written in October, sent to owners, and applied the same way every time ends most arguments about who pays. Forgetting the paper trail. Keep the attic reports, photos and invoices together by building, so the next board and the reserve study provider can see what was done.

Sources

These guides are general education for HOA boards and residents, not legal, tax, or financial advice. Rules vary by state and by your community's governing documents - check with a professional for your situation.

More from the board handbook

Track every request from report to done

Assign maintenance requests to a board member, email vendors a work order with photos, and keep the history. Free to start.